12 GCA § 8506
Interim Meeting
View official PDF ↗GPA is authorized to immediately implement an interim, emergency net metering rate structure wherein Customer generators shall be entitled to receive immediate credit for one hundred percent (100%) of the power generation capacity based on the specifications of the generation equipment installed times the rate the Guam Power Authority currently charges the customer until such time that GPA submits a rate structure to the PUC for the net metering program and it is approved by the PUC. This interim rate shall be subject to PUC revocation at any time.
§ The story of this section
- Enacted by P.L. 36-137 § 1 — introduced as Bill 351-36 · introduced by Clynton E. Ridgell + 5 cosponsors
Reconstructed from the Guam Code Annotated. For the authoritative version, see the official PDF.