12 GCA § 8505
Net Metering Billing Period
View official PDF ↗(a)The billing period for net metering may be either a monthly period, or with the written consent of the customer-generator, quarterly, semi-annual or annual period.
(b)The net energy measurement must be calculated in the following manner:
(1)The utility shall measure the net electricity produced or consumed during the billing period, in accordance with normal metering practices. CH. 8 GUAM POWER AUTHORITY
(2)If the electricity supplied by the utility exceeds the electricity generated by the customergenerator which is fed back to the utility during the billing period, the customer-generator must be billed for the net electricity supplied by the utility.
(3)If the electricity generated by the customer-generator which is fed back to the utility exceeds the electricity supplied by the utility during the billing period, the customer-generator is entitled to compensation for electricity provided to the utility during the billing period at a rate to be determined by the Public Utilities Commission. However, non-residential class customers with a customergenerator that exceeds one hundred
(100)kilowatts in generating capacity shall not be entitled to compensation for any electricity provided to the utility under this Section.
§ The story of this section
- Enacted by P.L. 27-132 § 1 — introduced as Bill 176-27 · introduced by Vicente C. Pangelinan
- Amended by P.L. 37-71 § 3 — introduced as Bill 191-37 · introduced by William A. ParkinsonWatch the public hearing · Sep 7, 2023
Reconstructed from the Guam Code Annotated. For the authoritative version, see the official PDF.