10 GCA § 26A104

Sanitary Inspections, Phases:

Guam Code AnnotatedTitle 10 — Health and Safety
View official PDF ↗

For the purposes of sanitary regulation, permitting of temporary workforce housing shall be required during each of the following phases:

(a)Primary Inspection Phase:

(1)During the Primary Inspection Phase, sanitary inspections shall be conducted quarterly following the issuance of the initial sanitary permit.

(2)The Primary Inspection Phase shall apply to all temporary workforce housing, new or currently existing, and shall endure until four

(4)consecutive quarters of satisfactory inspections have been achieved.

(3)Inspection during the Primary Inspection Phase shall be performed no sooner than forty-five

(45)days of the previous inspection conducted. If an inspection occurs sooner than forty-five

(45)days of the previous inspection conducted, the inspection shall not qualify as one of the quarterly inspections required.

(b)Secondary Inspection Phase:

(1)Secondary Inspection Phase shall be applied following successful completion of the Primary Inspection Phase, as defined in § 26A104(a). COL 10/6/2023 CH. 26A - TEMPORARY WORKFORCE HOUSING

(2)During the Secondary Inspection Phase, inspections shall be conducted on a semiannual basis.

(3)Inspection during the Secondary Inspection Phase shall be performed no sooner than ninety

(90)days from the previous inspection conducted. If an inspection occurs sooner than ninety

(90)days of the previous inspection conducted, the inspection shall not qualify as one of the semiannual inspections required.

(4)Successful completion of the Secondary Inspection Phase shall consist of two

(2)consecutive semiannual inspections that were rated satisfactory.

(5)Following a failed inspection or Change of Temporary Workforce Housing Status, the temporary workforce housing in question shall return to the Primary Inspection Phase.

(c)Tertiary Inspection Phase:

(1)During the Tertiary Inspection Phase, inspections will be conducted on an annual basis.

(2)Inspection during the Tertiary Phase shall be performed no sooner than one hundred eighty

(180)days from the previous inspection conducted. If an inspection occurs sooner than one hundred eighty

(180)days of the previous inspection conducted, the inspection will not qualify as one of the annual inspections required.

(3)Following a failed inspection or Change of Temporary Workforce Housing Status, the temporary workforce housing in question shall return to the Primary Inspection Phase.

Reconstructed from the Guam Code Annotated. For the authoritative version, see the official PDF.